*note: this is the sample document for the related job only
*author: theprocedure@engineer.comPOWER SUPPLIES INTO THE PANEL MAYBE GREATER THAN 24VOLTS. CARE MUST BE TAKEN NOT TO TOUCH LIVE PARTS OR CAUSE A SHORT CIRCUIT WITHIN THE PANEL IF WORK IS CARRIED OUT WHILST THE PANEL IS "LIVE".
1. INSPECT EXTERNALLY AND INTERNALLY FOR
CORROSION AND DAMAGE.
2. ENSURE THE PANEL IS INTERNALLY CLEAN.
3. CHECK THAT ALL COMPONENTS ARE SECURE AND CARDS ARE SECURELY
CLIPPED IN PLACE.
4. VISUALLY CHECK CONDITION OF INDICATORS , CONTROLLERS
AND ANNUNCIATORS.
2. ENSURE THE PANEL IS INTERNALLY CLEAN.
3. CHECK THAT ALL COMPONENTS ARE SECURE AND CARDS ARE SECURELY
CLIPPED IN PLACE.
4. VISUALLY CHECK CONDITION OF INDICATORS , CONTROLLERS
AND ANNUNCIATORS.
5. IF "LAMP TEST" FACILITY IS PROVIDED
CHECK THAT LAMPS
ILLUMINATE CORRECTLY. REPLACE FAULTY LAMPS .
6. VISUALLY CHECK TERMINALS AND CONDITION OF INTERNAL WIRINGS.
7. CHECK CABLE GLANDS FOR TIGHTNESS.
8. IF VENTILLATION FANS ARE FITTED , CHECK THE FANS OPERATE
CORRECTLY ANY ASSOCIATED AIR FILTERS ARE CLEAN AND
NOT BLOCKED.
ILLUMINATE CORRECTLY. REPLACE FAULTY LAMPS .
6. VISUALLY CHECK TERMINALS AND CONDITION OF INTERNAL WIRINGS.
7. CHECK CABLE GLANDS FOR TIGHTNESS.
8. IF VENTILLATION FANS ARE FITTED , CHECK THE FANS OPERATE
CORRECTLY ANY ASSOCIATED AIR FILTERS ARE CLEAN AND
NOT BLOCKED.
9. CHECK THAT THE PANEL ROOF IS CLEAN AND CLEAR
OF
FOREIGN MATERIALS.
FOREIGN MATERIALS.
10. ENSURE THAT THE DOORS
CLOSE CORRECTLY AND LATCH.
11. IF INTERNAL LIGHT FITTINGS ARE PROVIDED CHECK THAT
THESE FITTINGS ARE "ON" WHEN THE DOORS ARE OPEN.
11. IF INTERNAL LIGHT FITTINGS ARE PROVIDED CHECK THAT
THESE FITTINGS ARE "ON" WHEN THE DOORS ARE OPEN.